Projects
Construction Track Record of CEC
-
Structure Design
Kawagoe Thermal Power Station Water IntakeEquipment Modification
Location
Japan
Year
2010
Note
-
Seismic Design
Anegasaki Thermal Power Station Units 3 and 4Propane Tank Seismic Evaluation
Location
Japan
Year
2010
Note
-
Civil Engineering Design
Kashima Joint Power Station Unit 5
Location
Japan
Year
2010
Note
-
Structural Design
Hamakawasaki Plant 515 Building New Construction
Location
Japan
Year
2010
Note
-
Structural Design
Hamakawasaki Plant Equipment Expansion Outdoor DS Frame
Location
Japan
Year
2010
Note
-
Seismic diagnosis
Belt Frame
Location
Japan
Year
2010
Note
-
Structural Design
Negishi Plant Building and Machinery Foundation
Location
Japan
Year
2010
Note
-
Seismic diagnosis
Ukishima and Chidoricho Rack
Location
Japan
Year
2010
Note
-
Piping Frame Detailed Design
Hitachinaka Thermal Power Station Unit 2Expansion Project
Location
Japan
Year
2010
Note
-
Seismic diagnosis
Reinforcement Measures
Negishi Refinery On-Site Frame
Location
Japan
Year
2010
Note
-
Detail Design
Joetsu LNG Receiving Terminal Construction Project
Location
Japan
Year
2010
Note
-
Building Structure Design
SATL Sharp Thailand Plant
Location
Thailand
Year
2009
Note