Projects
Construction Track Record of CEC
-
Column Base Design
Kobe Power Station Unit 1 Boiler Steel
Location
Japan
Year
1997
Note
base connection design
-
Column Base Design
Maizuru Thermal Power Station Boiler Steel
Location
Japan
Year
1997
Note
base connection design
-
Column Base Design
Kin Thermal Power Station Boiler Steel
Location
Japan
Year
1997
Note
base connection design
-
Structural Design
Tachibanawan Power Station Absorber and Duct
Location
Japan
Year
1997
Note
-
Pipe Rack Design
Chita Midorihama Plant LPG Receiving Base
Location
Japan
Year
1997
Note
pipe rack
-
Civil Engineering Design
Nagoya Power Station (149MW)
Location
Japan
Year
1997
Note
-
Base Design
Higashidori Nuclear Power Plant T/G
Location
Japan
Year
1997
Note
frame design
-
Civil Engineering Design
Yokohama Refinery – No. 3 Gas TurbineNew Construction
Location
Japan
Year
1997
Note
-
Column Base Design
Kawasaki Power Station – Boiler Steel
Location
Japan
Year
1997
Note
base connection design
-
Foundation Design
Hitachinaka Thermal Power Station Unit 1(1,000MW)
Location
Japan
Year
1997
Note
-
Structure Design
Futtsu Thermal Power Station
Location
Japan
Year
1997
Note
structural design
-
Structural Design
Singapore Airport Test Shell New Construction
Location
Singapore
Year
1996
Note