Projects
Construction Track Record of CEC
-
Pipe Rack Design
Ukishima Plant North Pipe RackNew Construction
Location
Japan
Year
2008
Note
pipe rack
-
Structural Design
Negishi Plant – LNG Tank Hemisphere Assembly Building
Location
Japan
Year
2008
Note
-
Machinery Foundation Design
Negishi Plant – Low-Operating Volume CountermeasureEquipment Project
Location
Japan
Year
2008
Note
-
Machinery Foundation Design
Yokkaichi Plant Spherical Tank Equipment New Construction
Location
Japan
Year
2008
Note
-
Civil Engineering Design
Ukishima Plant – 4EO ProductionExpansion Reactor Pilot Plant
Location
Japan
Year
2008
Note
-
Steel Building Seismic Evaluation
Kainan Thermal Power Station Main Building andBoiler Support Frame
Location
Japan
Year
2007
Note
-
Machinery Foundation Basic Design
Joetsu Thermal Power Station LNG Piping LineProject
Location
Japan
Year
2008
Note
foundation design
-
Building Structure Design
Maizuru Thermal Power Station SamplingBuilding Expansion
Location
Japan
Year
2008
Note
structure
-
Foundation Design
Mizushima LNG Terminal Expansion Project
Location
Japan
Year
2008
Note
-
Civil and Steel Frame Design
Residual Oil Fluid Catalytic Cracking (FCC) Unit and OtherNew Construction Projects
Location
Japan
Year
2008
Note
civil engineering steel structure
-
Civil Steel Frame Design
First Solvent Dewaxing Unit Constructio
Location
Japan
Year
2007
Note
civil engineering steel structure
-
Civil Engineering Design
SE-9 Plant construction work
Location
Japan
Year
2007
Note